Prepare With Top Rated High-quality NCSC-Level-1 Dumps For Success in NCSC-Level-1 Exam [Q35-Q50]

Share

Prepare With Top Rated High-quality NCSC-Level-1 Dumps For Success in NCSC-Level-1 Exam

NCSC-Level-1 Free Certification Exam Easy to Download PDF Format 2022

NEW QUESTION 35
After deploying an AHV cluster connected to Cisco Nexus 9k switches, unexpected network behavior is observed. The consultant needs to rule out physical network mis-cabling without returning to the datacenter.
Which command from the host should the consultant run?

  • A. show interfaces
  • B. show lldp neighbors
  • C. show cdp neighbors
  • D. lldpctl

Answer: D

 

NEW QUESTION 36
A consultant is viewing an ESXi host via console without external network connectivity.
Which two IP addresses can be used to connect to the CVM (Choose two.)

  • A. 192.168.5.253
  • B. 192.168.5.2
  • C. 192.168.5.254
  • D. 192.168.5.1

Answer: B,C

 

NEW QUESTION 37
While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.
What would cause this warning to be issued?

  • A. There are not enough resources left in the single-node cluster.
  • B. Upgrading a single-node cluster requires the VMs to be shut down.
  • C. There are not enough resources left in the two-node cluster.
  • D. Upgrading a two-node cluster requires the VMs to be shut down.

Answer: B

 

NEW QUESTION 38
A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)

  • A. Open terminal and configure via ifconfig command.
  • B. Run the set_foundation_ip_address application on the VM desktop.
  • C. Ensure the vNIC is set to bridged adapter.
  • D. Configure the static IP address through the desktop virtualization software.

Answer: B,C

 

NEW QUESTION 39
A consultant creates a Windows VM after installing a new Nutanix cluster running AHV. The consultant has statically assigned an IP address to the VM but it is unable to communicate on the network.
Which action should the consultant take to resolve this issue?

  • A. Set a Group Policy to make sure the Windows Firewall is disabled.
  • B. Confirm that IPv6 is enabled on the guest VM.
  • C. Confirm that the VM vNIC is tied to the correct VLAN in Prism Element.
  • D. Mount and install the Nutanix Guest Tools.

Answer: C

 

NEW QUESTION 40
A consultant is setting up a new vSphere cluster. Customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available Which two settings should be turned on to meet the requirements? (Choose two.)

  • A. vSphere HA
  • B. vShpere DRS
  • C. vSphere Power Management
  • D. vSphere vMotion

Answer: A,B

 

NEW QUESTION 41
A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.
Which method can be used to successfully add the node?

  • A. Use Prism Element to Expand the cluster and select the re-image option.
  • B. Use Prism Element, which will downgrade the node by default during the node add process.
  • C. Upgrade the cluster to 5.9 and add the node through Prism Element.
  • D. Use the CLI and enter cluster add-node node-serial="node_serial".

Answer: A

 

NEW QUESTION 42
A consultant is using a customer's switch for installation. Although the 10GbE ports for each of the hosts are connected to the switch, the nodes fail to be discovered.
What is causing the issue?

  • A. 10GbE ports are configured with the incorrect duplex setting.
  • B. IPv6 is not enabled on the switch.
  • C. Foundation VM is running on a Windows host.
  • D. IPMI port is not plugged in.

Answer: B

 

NEW QUESTION 43
After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.
What is causing the issue?

  • A. The Cluster Virtual IP Address (VIP) was not set up during the process.
  • B. The consultant did not run Nutanix Cluster Check (NCC..
  • C. The cluster was not stopped prior to connecting to the customer network.
  • D. Foundation did not create the cluster successfully.

Answer: C

 

NEW QUESTION 44
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?

  • A. ESXi cluster DRS is enabled.
  • B. ESXi cluster admission control is disabled.
  • C. ESXi cluster admission control is enabled.
  • D. ESXi cluster HA is enabled.

Answer: C

 

NEW QUESTION 45
A customer is running out of storage in an ESXi cluster. The customer wants to add storage without paying for an additional hypervisor license.
Which option should the consultant recommend to meet the requirement?

  • A. Select the storage-only checkbox during Foundation and then expand the cluster in Prism.
  • B. Buy a new node to meet the requirements of the storage-only node specifications.
  • C. Convert the cluster to AHV to support storage-only node requirements.
  • D. Edit the factory_config.json file to configure the node as storage-only and then expand the cluster in Prism

Answer: B

 

NEW QUESTION 46
A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:
* The consultant's laptop and Nutanix nodes are plugged into a flat switch.
* The laptop, switch and nodes are plugged into supported power supplies.
* The laptop network adapters and FVM are configured with their corresponding IP addresses.
What is the cause for the connectivity failure to the FVM?

  • A. Network cables are not connected.
  • B. Laptop WiFi configured to use DHCP.
  • C. Desktop Firewall is blocking ping requests.
  • D. The switch is not plugged into the power supply.

Answer: C

 

NEW QUESTION 47
Refer to the exhibit.

A system administrator is using Range-Autofill tool to assign IP addresses to setup a multi-block cluster based on the following configuration:

Which additional changes must be made during the Foundation process to configure the cluster correctly?

  • A. Change IP address
  • B. Reorder block serial
  • C. Change host names
  • D. Reorder blocks

Answer: C

 

NEW QUESTION 48
A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.
Which option should be used to resolve this issue?

  • A. If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.
  • B. Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.
  • C. If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.
  • D. Verify that IPv6 Link Local and DHCP is enabled on all switch ports.

Answer: C

 

NEW QUESTION 49
A consultant is deploying a Nutanix cluster at a customer location. The consultant will be deploying the latest AOS along with the latest Nutanix hardware.
Which three references should the consultant review prior to this installation? (Choose three.)

  • A. Release Notes
  • B. Acropolis Advanced Administration Guide
  • C. Software Product Interoperability
  • D. Field & Security Advisories
  • E. End-Of-Life (EOL) Information

Answer: A,C,D

 

NEW QUESTION 50
......

Get 100% Success with Latest Nutanix SE Academy NCSC-Level-1 Exam Dumps: https://examcollection.prep4king.com/NCSC-Level-1-latest-questions.html